Nuvolari Lenard contributed both the exterior and interior design for the 115 metres, which are due to be delivered in 2021. For the Venetian design studio, this is the third giga format that is currently under construction at Lürssen according to their exterior specifications. Project "Redwood" (142 m) is due to be launched in 2020 and project "Jag" (125 m) in 2023. Moran Yacht & Ship is overseeing the construction of the "Enzo" for an owner who is not relying on the services of Rob Moran for the first time. However, the Fort Lauderdale-based brokerage house lists the 115-metre project under the name "Testarossa". Either way, one is tempted to associate the 115 metres with the iconic Italian sports car brand. Nevertheless, caution is advised. It is not uncommon for yacht aficionados to be misled by the code name of the new build, as was recently the case with the Moran "Palo Alto" project. The 111 metre long Lürssen newbuild wasn't actually accepted by a Silicon Valley entrepreneur, but by a Russian oligarch - under the clear name "Tis".

Stellvertretender Chefredakteur BOOTE EXCLUSIV